Date of Trail Inspection/Ride06/21/2024
Your NameScott KERR
Your EmailEmail hidden; Javascript is required.
Start Time01:30 PM
End Time05:30 PM
Total Hours3
COKL AREA: Trail and/or Staging Area Number
  • P4 - Monck Rd & end of Trail 9
5-POINTS AREA: Trail and/or Staging Area Number
KORMA Single Track Trail(s) and Staging Area(s)Parking lot Pinery Rd/ Monck Rd. KORMA/OFTR trail 116 (Pinery single track south of Monck Rd). 1 gate closed and cut lock replaced with nut and bolt.
Total KMs Traveled on Trail5
Trail Hazards Still to Be Corrected
Identify any issues with club tools/machines that needs attention.
Trail Maintenance and/or Repairs Completed6 total trail bockages removed, 1 trail reroute put in place, 20+ downed trees cut
Trail Hazard Photos
Trail Hazard Locations
Partner Name(s) if not in the list above
Notes

Friday 21 June 2024

13:30 Parking lot Pinery Rd at Monck Rd, walk KORMA Single Track
found 6 locations trail completely blocked by downed trees
14:00 back at truck, gear up. walk back in and clear blockages
with hand and chain saw
17:00 back at truck trail cleared before and after photos
17:24 check gate top north end of trail 9, open, one lock cut off,
I replaced it with nut and bolt.
17:30 finish

4 hours, walked 5 km
1 litre premix fuel