| Date of Trail Inspection/Ride | 08/10/2024 |
|---|---|
| Your Name | Mike Palmer |
| Your Email | Email hidden; Javascript is required. |
| Start Time | 09:00 AM |
| End Time | 03:30 PM |
| Total Hours | 6.5 |
| COKL AREA: Trail and/or Staging Area Number |
|
| 5-POINTS AREA: Trail and/or Staging Area Number | |
| KORMA Single Track Trail(s) and Staging Area(s) | |
| Total KMs Traveled on Trail | 64 |
| Trail Hazards Still to Be Corrected | |
| Identify any issues with club tools/machines that needs attention. | |
| Trail Maintenance and/or Repairs Completed | Few smaller trees removed from trail in various locations |
| Trail Hazard Photos | |
| Trail Hazard Locations | |
| Partner Name(s) if not in the list above | |
| Notes | Out to 99 and 96 for the member appreciation ride leading group. Cut one larger log back to get a sxs thru on 96 had been previously cut. Several trees down in various locations most have been cut back but at present time both trails are passable. Bypass on 96 is narrow in Several areas very technical trail. |