Date of Trail Inspection/Ride05/03/2025
Your NameTony Bullough
Your EmailEmail hidden; Javascript is required.
Start Time08:30 AM
End Time02:30 PM
Total Hours6.0
COKL AREA: Trail and/or Staging Area Number
  • Trail 10 (Beginner Trail)
  • Trail 11 (Beginner Trail)
  • Trail 72 (Old Farts Trail)
  • P2 - 93 Pinery Road Staging Area
5-POINTS AREA: Trail and/or Staging Area Number
KORMA Single Track Trail(s) and Staging Area(s)
Total KMs Traveled on Trail45
Trail Hazards Still to Be Corrected
Identify any issues with club tools/machines that needs attention.
Trail Maintenance and/or Repairs CompletedLeft from Superior and headed north, vrt still needs major work from the Log to The 3rd. From the Steel Bridge it is all but closed, Howard Reeds cut a path through but needs major work. From Shuttleworth up to Trail 11 it is in very good shape, there are a few widdow makers that need come down but they look stable for now. Trail 11 is open and so is the trail to the Boiler, we didn't go past the boiler but there are excavator tracks going past. Trail 10 is open to P2. We started to go on Trail 72 from the top end but only made it about a klm before we ran out of energy. We're getting old lol. 🙂in and ran out of
Trail Hazard Photos
Trail Hazard Locations
Partner Name(s) if not in the list above
  • Chris Pellow
  • Chris Van De Veld