| Date of Trail Inspection/Ride | 05/03/2025 |
|---|---|
| Your Name | Tony Bullough |
| Your Email | Email hidden; Javascript is required. |
| Start Time | 08:30 AM |
| End Time | 02:30 PM |
| Total Hours | 6.0 |
| COKL AREA: Trail and/or Staging Area Number |
|
| 5-POINTS AREA: Trail and/or Staging Area Number | |
| KORMA Single Track Trail(s) and Staging Area(s) | |
| Total KMs Traveled on Trail | 45 |
| Trail Hazards Still to Be Corrected | |
| Identify any issues with club tools/machines that needs attention. | |
| Trail Maintenance and/or Repairs Completed | Left from Superior and headed north, vrt still needs major work from the Log to The 3rd. From the Steel Bridge it is all but closed, Howard Reeds cut a path through but needs major work. From Shuttleworth up to Trail 11 it is in very good shape, there are a few widdow makers that need come down but they look stable for now. Trail 11 is open and so is the trail to the Boiler, we didn't go past the boiler but there are excavator tracks going past. Trail 10 is open to P2. We started to go on Trail 72 from the top end but only made it about a klm before we ran out of energy. We're getting old lol. 🙂in and ran out of |
| Trail Hazard Photos | |
| Trail Hazard Locations | |
| Partner Name(s) if not in the list above |
|
| Notes |