| Date of Trail Inspection/Ride | 05/05/2025 |
|---|---|
| Your Name | DOUG BERTRAND |
| Your Email | Email hidden; Javascript is required. |
| Start Time | 11:00 AM |
| End Time | 01:00 PM |
| Total Hours | 1 |
| COKL AREA: Trail and/or Staging Area Number | |
| 5-POINTS AREA: Trail and/or Staging Area Number |
|
| KORMA Single Track Trail(s) and Staging Area(s) | Leias Lane |
| Total KMs Traveled on Trail | 1 |
| Trail Hazards Still to Be Corrected | still lots of debris to be cleared before trail can be used |
| Identify any issues with club tools/machines that needs attention. | |
| Trail Maintenance and/or Repairs Completed | cutting storm damage |
| Trail Hazard Photos | |
| Trail Hazard Locations | |
| Partner Name(s) if not in the list above |
|
| Notes | cleared the first km of all small debris – several larger tress/branches need to be cut ( only had hand saw). Large dead tree fell on the bridge (see picture) it did not appear to have broken it, but will need to be checked, did not want to go under it as I was alone. Walked the second KM and cleared some smaller stuff. lots more to do before the trail can be used. |