Date of Trail Inspection/Ride05/04/2026
Your NameMike Palmer
Your EmailEmail hidden; Javascript is required.
Start Time08:30 AM
End Time03:30 PM
Total Hours7
COKL AREA: Trail and/or Staging Area Number
  • VRT North (Fenelon to Kinmount)
  • P1 - Superior Propane Staging Area
5-POINTS AREA: Trail and/or Staging Area Number
KORMA Single Track Trail(s) and Staging Area(s)
Total KMs Traveled on Trail27.4
Trail Hazards Still to Be CorrectedRemove beavers from area went by around 730 pm and 2 beavers were working on blocking it up again. Is it possible to trap them in this area?
Identify any issues with club tools/machines that needs attention.
Trail Maintenance and/or Repairs CompletedGrading vrt and filling in holes along the trail. Contacted Mark at LCP to pull the cage off of the culvert at the swamp that the beavers had blocked up again causing water to be over the trail water was down about 2 ft after it was cleaned and replaced.
Trail Hazard Photos
Trail Hazard Locations
Partner Name(s) if not in the list above
Notes

Tractor ended with 102.6 hrs on the meter today. Yamaha ran well as well as blue dump trailer was used.
Used several yards of gravel from Superior parking lot.
Completed from Northline to just South of Burnt River bridge.