| Date of Trail Inspection/Ride | 05/11/2026 |
|---|---|
| Your Name | Mike Palmer |
| Your Email | Email hidden; Javascript is required. |
| Start Time | 08:30 AM |
| End Time | 04:00 PM |
| Total Hours | 7.5 |
| COKL AREA: Trail and/or Staging Area Number |
|
| 5-POINTS AREA: Trail and/or Staging Area Number | |
| KORMA Single Track Trail(s) and Staging Area(s) | |
| Total KMs Traveled on Trail | 31 |
| Trail Hazards Still to Be Corrected | Ongoing |
| Identify any issues with club tools/machines that needs attention. | |
| Trail Maintenance and/or Repairs Completed | Grading and filling in holes on vrt from 3rd to pinery rd see notes for details |
| Trail Hazard Photos | |
| Trail Hazard Locations | |
| Partner Name(s) if not in the list above | |
| Notes | Also cleaned out various plugged ditchs along the way. Vrt and trail 10 got most of the pooled water flowing from edge of rail trail. Also 1st deep water hole on tr10 got drain dug deeper to let all standing water to flow away from trail. Picked up garbage and branches along the trail also. |