Date of Trail Inspection/Ride05/19/2026
Your NameRoss Petty
Your EmailEmail hidden; Javascript is required.
Start Time09:00 AM
End Time10:30 AM
Total Hours1.5
COKL AREA: Trail and/or Staging Area Number
  • VRT Central (Fenelon to Lindsay)
5-POINTS AREA: Trail and/or Staging Area Number
KORMA Single Track Trail(s) and Staging Area(s)
Total KMs Traveled on Trail5.0
Trail Hazards Still to Be Corrected
Identify any issues with club tools/machines that needs attention.
Trail Maintenance and/or Repairs CompletedAdjust the bolt on the cross over bar on the north gate at Naylor Road, The gate posts are out of alignment which prevents the lock tab from fitting into the slot on the opposing gate section.
Trail Hazard Photos
Trail Hazard Locations
Partner Name(s) if not in the list above
  • Ross Petty
Notes