Date of Trail Inspection/Ride05/20/2026
Your NameTerry Blackmore
Your EmailEmail hidden; Javascript is required.
Start Time11:30 AM
End Time02:00 PM
Total Hours2.5
COKL AREA: Trail and/or Staging Area Number
  • VRT North (Fenelon to Kinmount)
5-POINTS AREA: Trail and/or Staging Area Number
KORMA Single Track Trail(s) and Staging Area(s)
Total KMs Traveled on Trail40.4
Trail Hazards Still to Be CorrectedNone
Identify any issues with club tools/machines that needs attention.
Trail Maintenance and/or Repairs CompletedCut two tree’s that had fallen across the trail. Cleared some brush that fell after last nights storm.
Trail Hazard PhotosTrail Hazard Photos
Trail Hazard Locations
Location (What3Words)
Fried.donates.vaguer
Partner Name(s) if not in the list above
Notes

I rode the VRT from Burnt River to Kinmount. With the help of another rider that just happened to be there, we cleared two tree’s that had blown down from last nights storm. I cleared some brush along the way. I returned via VRT then through the Pinery. The trail was good. The low spots are full of water. I cleared some brush that had fallen. There are a few ruts from running water. Overall the trail is good.