| Date of Trail Inspection/Ride | 05/25/2026 |
|---|---|
| Your Name | Mike Palmer |
| Your Email | Email hidden; Javascript is required. |
| Start Time | 08:30 AM |
| End Time | 05:30 PM |
| Total Hours | 9 |
| COKL AREA: Trail and/or Staging Area Number |
|
| 5-POINTS AREA: Trail and/or Staging Area Number | |
| KORMA Single Track Trail(s) and Staging Area(s) | |
| Total KMs Traveled on Trail | 56 |
| Trail Hazards Still to Be Corrected | Didn't get to second washout bit farther up trail 10 |
| Identify any issues with club tools/machines that needs attention. | Both trailers need welding Myles is aware and taking care of them. |
| Trail Maintenance and/or Repairs Completed | Fixed up washout trail 10 by the culvert beaver keeps plugging up and drained pooling water off of the trail in the area. |
| Trail Hazard Photos | |
| Trail Hazard Locations | |
| Partner Name(s) if not in the list above | |
| Notes | Fix washout on trail 10 dug new ditch along side of trail to move water off of the trail. Moved in full load of gravel to site to level up area. Also drained water off of trail by culvert nearby also drained large water hole over most of trail just above the culvert. Put new ditch along side of trail to drain area out. Also put in new areas above the washout for water to flow off of the trail before running down the hill. |