Date of Trail Inspection/Ride05/25/2026
Your NameTerry Blackmore
Your EmailEmail hidden; Javascript is required.
Start Time11:30 AM
End Time03:00 PM
Total Hours3.5
COKL AREA: Trail and/or Staging Area Number
  • VRT North (Fenelon to Kinmount)
  • Trail 9 (Beginner Trail)
  • Trail 10 (Beginner Trail)
  • Trail 11 (Beginner Trail)
5-POINTS AREA: Trail and/or Staging Area Number
KORMA Single Track Trail(s) and Staging Area(s)
Total KMs Traveled on Trail37.7
Trail Hazards Still to Be CorrectedThe tree I pulled off posses no danger but could be cut up if someone has a saw.
Identify any issues with club tools/machines that needs attention.
Trail Maintenance and/or Repairs CompletedI rode from Burnt River to Kinmount on the VRT then returned south and took trail 11 into the Pinery. I tossed some wind blow debris that had fallen on the trail into the woods. I traveled north on trail 9 to the Monk Road. I pulled a tree that had fallen onto the trail off to the side. Didn't have my chain saw. The tree is now off the trail. I did mark it with an orange flag. Then returned to Burnt River on trails 9 and 10 to the VRT.
Trail Hazard Photos
Trail Hazard Locations
Location (What3Words)
luxury.attracted.jargon
Partner Name(s) if not in the list above
Notes

I can't upload any photos.
The trails were in pretty good shape. There are some water holes and areas affected by rain runoff. mothing serious.